"XJDano" (xjdano)
06/28/2017 at 13:00 • Filed to: Rant, Work | 0 | 2 |
Two trades can’t occupy the same mechanical room. College contact set it up, mechanical contractor is removing boiler plates seen here and installing new air handler unit today. I was supposed to be here yesterday but 3rd party consultant couldn’t get a guy there so it got pushed back until today, and now back to a start time of 3pm. Which is when another job on another part of campus was supposed to start. Now I have to separate crew to be 2 places at once, 2 guys at each project now.
Also had a meeting about removing the 36 windows above the arch week of July 10. ( Duplicate set of 9 & 9 on West side) Coordinating with installers to work along with us. Hopefully that job doesn’t get clustered like this mornings.
I’m now having lunch at home.
Party-vi
> XJDano
06/28/2017 at 13:08 | 1 |
I need to renovate a kitchen and install a walk-in unit, and have no building permit. I need it done by August 23. I am curled into a ball, ignoring everything.
Matsayz
> Party-vi
06/28/2017 at 13:37 | 0 |
Do not hire Lowe’s. Worst experience ever. Kitchen remodel was supposed to take 4-6wks, took 10 months, two different contractors and 5 different countertops. Also received half of my money back but ugh never again while I live in the house being renovated.